Energy Storage Projects

Wanda Plaza | 2MW/4MWh

This is Wanda Group’s first energy storage project in Longgang, Shenzhen. The group aims to be a one-stop green mall that integrates PV + energy storage + Electric Vehicle charging stations and providing shoppers with a convenient and sustainable shopping experience. The advantages of user-side energy storage include peak shaving, increased power backup capacity, cost reduction and enhanced efficiency.

Bosch | 2MW/4MWh

Bosch’s first energy storage project globally features an installed capacity of 2MW/4MWh, utilizing Commercial & Industrial energy storage liquid cooling integrated cabinets. The project in Nanjing enables daily electricity savings of 8,000 kWh, significantly reducing overall electricity costs. Additionally, it integrates seamlessly with Bosch’s existing photovoltaic (PV) power stations, enhancing the utilisation rate of the PV system and increasing the proportion of green electricity used in the factory.

Ready to Take Control of Your Energy Future?

Let NEFIN help you uncover the full potential of your building’s energy efficiency. Contact our team today to schedule an energy audit and take the first step towards a more sustainable future.